/home/techb158/trellopowerup.abdallabala.com/docs
NameSizeModeActions
00-design-study.md36780644editdlrm
01-uml-class-diagram.puml118690644editdlrm
02-use-case-diagram.puml37630644editdlrm
03-sequence-diagrams.puml97320644editdlrm
04-database-entity-model.mmd70510644editdlrm
05-database-schema.sql133720644editdlrm
06-diagram-preview.html50210644editdlrm
07-design-checklist.md32560644editdlrm
08-step-2-storage-layer.md53250644editdlrm
09-step-3-risk-crud-ui.md33800644editdlrm
10-step-4-mitigation-workflow.md39960644editdlrm
11-step-5-deployment-gate-workflow.md22920644editdlrm
12-step-6-multi-pm-integration.md37700644editdlrm
13-step-6-1-microsoft-planner-integration.md23350644editdlrm
14-step-7-reporting-export.md41580644editdlrm
15-step-7-1-oauth-live-connectors.md45450644editdlrm
16-step-8-user-roles-access-control.md32970644editdlrm
17-step-9-production-deployment-security.md42280644editdlrm
18-step-10-final-academic-submission.md31990644editdlrm
19-final-report-draft.md68140644editdlrm
20-instructor-submission-checklist.md36390644editdlrm
21-demo-script.md39480644editdlrm
22-traceability-matrix.md48470644editdlrm
23-testing-evidence.md29610644editdlrm
24-evaluation-rubric-mapping.md29100644editdlrm
25-final-deployment-runbook.md32140644editdlrm
26-known-limitations-and-future-work.md26320644editdlrm
27-final-qa-checklist.md28930644editdlrm
28-demo-rehearsal-script.md36180644editdlrm
29-submission-freeze-report.md27690644editdlrm
30-final-known-issues.md18760644editdlrm
31-trello-powerup-implementation-guide.md76080644editdlrm
32-vps-deployment-guide.md36970644editdlrm
dashboard-spec.md36910644editdlrm
methodology-mapping.md24710644editdlrm
next-implementation-step.md13040644editdlrm
trello-admin-setup.md21750644editdlrm
Edit: /home/techb158/trellopowerup.abdallabala.com/docs/30-final-known-issues.md (1876B)
# Final Known Issues and Controlled Limitations Date: 2026-07-04 ## Known limitations | Area | Limitation | Rationale | |---|---|---| | Storage | Uses JSON file storage in prototype mode | Keeps the academic prototype lightweight and easy to run | | Live integrations | OAuth-ready clients are included, but real production use requires provider credentials | Prevents hardcoded secrets and unsafe testing | | PDF export | Executive report is printable HTML, not server-side PDF | Avoids extra dependencies and keeps the prototype simple | | Authentication | Role switching is suitable for prototype demonstration | Production deployment should connect to real identity provider | | Risk scoring | Scoring model is an implementation extension | The source framework provides conceptual direction, not a final universal scoring formula | | Industrial validation | Uses sample data and workflow validation | Full industrial validation requires real project data and stakeholder review | | PM sync | Shared adapter model supports simulated and live sync boundaries | Each provider API requires organization-specific setup and permissions | ## Not defects The following are intentional prototype decisions: 1. No real OAuth secrets are included. 2. Live API calls are disabled unless explicitly enabled. 3. JSON storage is used before database migration. 4. Deployment gate thresholds are configurable implementation logic. 5. The dashboard is designed as a working academic prototype, not a commercial SaaS product. ## Future work Recommended next improvements: 1. PostgreSQL migration. 2. Real identity provider integration. 3. Live industrial case study. 4. Configurable scoring weights by AI project typology. 5. Advanced dashboard analytics. 6. Automated PDF generation. 7. Provider-specific sync conflict resolution. 8. Deployment monitoring and incident tracking.